{"id":3755,"date":"2024-01-16T13:33:07","date_gmt":"2024-01-16T11:33:07","guid":{"rendered":"http:\/\/www.energiya.com.ua\/?p=3755"},"modified":"2024-01-16T13:33:08","modified_gmt":"2024-01-16T11:33:08","slug":"servisnyj-pusk-kotla-ta-pusko-nalahodzhuvalni-roboty-z-nadanniam-rezhymnykh-kart-kotla-e-1-0-0-9h-3-z-ridkopalyvnym-palnykom-cib-unigas-pg60-06-g-pr-uay","status":"publish","type":"post","link":"http:\/\/www.energiya.com.ua\/en_gb\/servisnyj-pusk-kotla-ta-pusko-nalahodzhuvalni-roboty-z-nadanniam-rezhymnykh-kart-kotla-e-1-0-0-9h-3-z-ridkopalyvnym-palnykom-cib-unigas-pg60-06-g-pr-uay\/","title":{"rendered":"Service start-up of the boiler and commissioning works with the provision of mode maps of the E-1,0-0,9G-3 boiler with a CIB UNIGAS PG60-06 G-PR.UAY liquid fuel burner."},"content":{"rendered":"<p>The service start-up of the boiler and commissioning works with the provision of the operating cards for the E-1.0-0.9G-3 boiler were carried out by our specialists.<\/p>\n\n\n\n<p>After successful completion of the installation work, according to the project <a href=\"http:\/\/www.energiya.com.ua\/en_gb\/rozrobka-proektu-z-perevodu-kotla-e1-9-z-pryrodnoho-hazu-na-ridke-palyvo\/\" target=\"_blank\" rel=\"noopener\" title=\"\">\"Technical re-equipment of the E1\/9 boiler to convert it from natural gas to liquid fuel\"<\/a>Our highly qualified specialists carried out the service start-up and commissioning of the E-1.0-0.9G-3 boiler. An important component of this technical re-equipment is the installed diesel fuel burner, which is a monoblock burner manufactured to modern safety and efficiency standards.<\/p>\n\n\n\n<p>The selected model for this project is the PG60 G-.PR.S.UA.Y diesel fuel burner manufactured by <a href=\"https:\/\/www.cibunigas.it\/en\/\" target=\"_blank\" rel=\"noopener\" title=\"\">CIB UNIGAS<\/a>This burner is characterised by high reliability and optimum efficiency, ensuring efficient use of liquid fuel to ensure optimum steam boiler performance.<\/p>\n\n\n\n<p>During the service start-up and commissioning, our specialists not only ensured the smooth operation of the new equipment, but also prepared the mode maps for the E-1.0-0.9G-3 boiler. This will optimise its operation, ensuring optimum operating conditions and maintaining a high level of productivity. This approach to commissioning reflects our deep commitment to the highest quality standards and impeccable reliability in the power equipment industry.<\/p>","protected":false},"excerpt":{"rendered":"<p>The service start-up of the boiler and commissioning works with the provision of the mode cards for the E-1.0-0.9G-3 boiler were carried out by our specialists. After the successful completion of installation works, in accordance with the project \"Technical re-equipment of the E1\/9 boiler with the aim of converting it from natural gas to liquid fuel\", our highly qualified specialists carried out service start-up and commissioning of the E-1,0-0,9G-3 boiler. An important component of this technical... <a class=\"read-more\" href=\"http:\/\/www.energiya.com.ua\/en_gb\/servisnyj-pusk-kotla-ta-pusko-nalahodzhuvalni-roboty-z-nadanniam-rezhymnykh-kart-kotla-e-1-0-0-9h-3-z-ridkopalyvnym-palnykom-cib-unigas-pg60-06-g-pr-uay\/\"> Read more<\/a><\/p>","protected":false},"author":1,"featured_media":3756,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"two_page_speed":[]},"categories":[91],"tags":[],"_links":{"self":[{"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/posts\/3755"}],"collection":[{"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/comments?post=3755"}],"version-history":[{"count":1,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/posts\/3755\/revisions"}],"predecessor-version":[{"id":3757,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/posts\/3755\/revisions\/3757"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/media\/3756"}],"wp:attachment":[{"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/media?parent=3755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/categories?post=3755"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.energiya.com.ua\/en_gb\/wp-json\/wp\/v2\/tags?post=3755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}