Вартість проєкту котельні.

Cost of the boiler house design.

How to start building a boiler house? The construction of a boiler house should start with the development of a concept and project. But how do you budget the cost of the project? While the cost of equipment can be calculated independently to be close to reality, the price of the project usually remains unknown. How much does a boiler house project cost? What determines the cost of a boiler house project for an enterprise? What price for the project should be included in the... Read more

Розробка проекту реконструкції системи опалення офісного центру.

Development of a design for the reconstruction of the heating system of an office center.

Specialists of the IVK ENERGIA have completed the development of project documentation for the reconstruction of the heating system of a large office and warehouse complex. The managers of this facility contacted us with a request to reconstruct the heating system of the complex at the beginning of the year. Together, we studied their needs and found the optimal solution that would allow them to effectively use the existing equipment and provide comfortable heating for the entire complex. The ordered project has already been... Read more

Сервісний пуск котла та пуско-налагоджувальні роботи з наданням режимних карт котла Е-1,0 -0,9Г-3 з рідкопаливним пальником CIB UNIGAS PG60-06 G-PR.UAY.

Service start-up of the boiler and commissioning works with the provision of mode maps of the E-1,0-0,9G-3 boiler with a CIB UNIGAS PG60-06 G-PR.UAY liquid fuel burner.

The service start-up of the boiler and commissioning works with the provision of the mode cards for the E-1.0-0.9G-3 boiler were carried out by our specialists. After the successful completion of installation works, in accordance with the project "Technical re-equipment of the E1/9 boiler with the aim of converting it from natural gas to liquid fuel", our highly qualified specialists carried out service start-up and commissioning of the E-1,0-0,9G-3 boiler. An important component of this technical... Read more

Working project "Furnace room for heating the administrative building"

The working draft "Furnace room for heating of the administrative building at the address: Kyiv region, Brovary ......" was developed by the designers of our company. Previously, the administrative building was heated by a gas boiler. In order to optimise heating costs, it was decided to switch to solid fuel. A new solid fuel boiler house based on the Heiztechnik Hit Pellet Duo boiler unit with a heat output of 70 kW was planned... Read more

Development of a project to convert boiler E1/9 from natural gas to liquid fuel.

The Project Department of the IV ENERGY has developed a working project "Technical re-equipment of the E1/9 boiler with the aim of its conversion from natural gas to liquid fuel".The need for technical re-equipment of the existing E1/9 steam boiler is primarily related to the desire of the enterprise management to reduce the risks of rising fuel prices and to have a backup option in case of a significant increase in natural gas prices. У... Read more

A working draft for the installation of a chimney for the boiler house of JSC ROGANSKY KARTON FABRICKS was completed.

A working draft for the installation of a chimney for the boiler house of JSC "ROGANSK KARTON FABRIC" was developed: DE-10-14GM with a steam capacity of 10 tonnes of steam per hour and DKVR-6.5-14. The boilers are connected to a common brick chimney with a height of H=45 m and a diameter of 1500 mm. The chimney is in an emergency condition and cannot be further operated. The purpose of this project... Read more

A working draft was developed for the reconstruction of the steam distribution unit.

The specialists of our design department have developed a working draft "Reconstruction of the steam distribution unit at Plant No. 3 during the commissioning of a solid fuel boiler house at the following address: Kulinichi, 17 Shkilna Street, Kharkiv Region, urban-type settlement Kulinichi". The need to reconstruct the existing steam distribution unit in the bakery shop arose when a backup solid fuel boiler with an E-2.5 boiler was put into operation. Read more

Working design of a steam boiler house for an enterprise in Lviv region.

As a rule, the winter period is the time when prudent owners begin work on improving their enterprise energy system. They plan to carry out the work and put into operation, for example, an updated boiler house just in time for the start of the heating or working season. That is why our company is actively involved in the design of facilities throughout Ukraine. For example, at the beginning of 2023, we have... Read more

Commissioning tests at Balakleya Heating Networks

Immediately after the liberation of Balakleya from the Russian Nazis, work began to restore the city's infrastructure. An important issue is the supply of heat to Balakleya residents. Balakleya Heat Networks resumed supplying heat to the town. However, we have already carried out routine maintenance and adjustment of boilers, which are usually carried out before the start of the heating season, during the heating season. In December 2022, our specialists carried out commissioning and adjustment... Read more

Пропонуємо теплогенератор водогрійний ТгТ-1 зі складу у Харкові.

We offer a hot water heat generator TgT-1 from our warehouse in Kharkiv.

From our warehouse in Kharkiv, we offer a hot water heat generator TgT-1. Power - 1 MW. The fuel is pellets. For the prompt creation of a solid fuel boiler room, a new pellet heat generator is available in stock: Remote furnace (pre-furnace) Heat recovery boiler Advantages of this heat generator: High efficiency Low level of harmful emissions No sintering and melting of ash Automation of control Minimum amount of waste in the form of ash More information... Read more